Project Description

Lancaster Royal Infirmary MRI Scanner

A Meigan earthing system was installed as part of the IPS power installation, feeding the power supplies to the bed head socket outlets and the MRI scanner power supplies. The specialist earthing for the bed head supplies are connected back to the IPS Meigan earthing system. A second Meigan earthing system has been installed in the MRI scanner unit.

The existing fire alarm installation has been modified and extended to accommodate the new building adaptions. Additional smoke detectors was installed together with roof detection all of which has been fully addressed and commissioned

No ferrous metal is installed in the MRI scanner unit including light fittings.  Works also included

  • Distribution and sub-main distribution
  • New switchgear
  • IPS distribution equipment
  • Lighting and power
  • Fire alarm, door access & nurse call
  • Electrical installation to the new MRI Suite

  • Project Value £110,000

  • Meigan Earthing system

  • Working with Main Contractor F Parkinson

GALLERY

Delivering a full electrical infrastructure upgrade within an operational school requires more than technical expertise alone. It demands planning, communication and a commitment to working collaboratively with everyone involved.

This project demonstrates Thompson’s ability to undertake complex electrical infrastructure upgrades in occupied environments while maintaining the highest standards of safety, quality and client care.
It’s The Thompson Way: trusted delivery, practical engineering and infrastructure built for the future.