Project Description

UCLAN – Chiller Installation

This project for the University of Central Lancashire comprised the replacement of existing roof top chiller plant with two new Daikin cooled air chillers.

Work at high level included crane lift to site the new equipment.

Existing pipework feeding the chilled water was repaklced as part of this work.  New chilled water pumps, low loss header and pressurisation unti were also installed in the plant room.

Ceiling mounted fan coil cassette units were installed to various areas with appropriate pipework and electrical connections.

A new controls system was installed by Nyke energy including modifications to the existing panel.

  • Project Value £290,000

  • Client University of Central Lancashire

     

  • Prinicpal Contractor

  • Energy Effciency

GALLERY

Delivering a full electrical infrastructure upgrade within an operational school requires more than technical expertise alone. It demands planning, communication and a commitment to working collaboratively with everyone involved.

This project demonstrates Thompson’s ability to undertake complex electrical infrastructure upgrades in occupied environments while maintaining the highest standards of safety, quality and client care.
It’s The Thompson Way: trusted delivery, practical engineering and infrastructure built for the future.
Contact Us